Laserfiche WebLink
<br />lA <br />~~' YIAE 1SETHODS, overhead stoping; hand drilling <br />r' <br />~I e~loyed; timbering by Mulls and lagging, timbers <br />~~ used native spruce and pine. Noaioua gases aretnot met <br />'~~ witYr, Sanitary condition is good. Shaft is divided <br />I!' <br />II;' into two compartments and is provided with ladderways. <br />~` <br />~i ~ STOTI ST I C S. <br />II Grose tonnage average tonnage per <br />1i month 30 <br />~I <br />1' ~ DEVELOPIiENT: <br />'f <br />Total number of Peet in shafts 400 <br />~ Cost per foot X25, <br />,' <br />~ Total number oP feet in drifts and leveal 400 <br />Cost per Poot X10, <br />~• Total number of Peet in Dross cuts 100 <br />Cost per foot X10, <br />~ Total number oP feet in winzes and raises 100 <br />coat per Poot 210, • <br />Total number of Peet in development 1,000 <br />Yen employed: <br />I, <br />2 miners 8 hours at $ 3.00 <br />I~ r <br />1 trammer 3.•00 <br />i <br />1 <br />Cost of powdgr 14 ots per lb. <br />average cost per month $25.00 <br />Averap;e assay value oP ore $20.00 <br />Coat per ton mining ore X6,00 <br />Coat per ton for transporting ore 2.00 • <br />Cost foi treatment FeT ton X5.00 <br />GENERAL FEMAF~S. <br />All shafts, pits and vtner excavations on properly <br />securely covered or fenced. <br /> <br />