Laserfiche WebLink
h <br /> <br />T UITB S[,: <br />Pain opaniag is 5 E 7, 800 ft. lang. T imbered-where <br />neoeseary with l0 E 10 tunnel seta. Compressor room is <br />60 ft. from mouth of tunnel. ' <br />1[INg YgTHODS: Piston drills. Timbering by square seta, <br />timbers u aed native apruoe and pine. UndergrouIId•tremming by <br />steel oars and 8~ T-raii track; trackage 800 Yt.. sanitary <br />condition is good ~ ~ - <br />S T A T I S T I C 3. <br />Total number of feet iA shafts ~ 100 <br />Cost of same $15. per foot. <br />Total number oY feet in tunnels and ~dita 800 <br />Coat per foot $12.00 <br />Total number of felt in development 900 <br />Yen employed: ~ ' <br />2 machine dr 111 men 8 hours $ 4.00 <br />2 trammera • 3.00 <br />1 ooauPreasman • 4.00 <br />Averaga number of men employed for the year 6 <br />Cost of electricity power $150.00 per meath <br />coat of timbers average per month $10.00 <br />Coat of steel average per month $5.~0 <br />Cost of oil, average per month $2.00 <br />Coat of powder 12-12 ota per ib; average cost per month $125. <br />• GENERAL REMARKS. <br />All shafts, Pits and other exeavatioita on the property ae- <br />ourely covered or Penoed; •All eooidenta have been reported <br />to the Bureau of Yinea. Y1ne is not a regular Droduoar and <br />la not irorked continuously. Yanagament is fam111ar with the <br />statutes relating to the <br />operatics of metalliferous mines . <br /> <br /> <br /> <br />i. <br />