Laserfiche WebLink
<br />r~~V <br />two oompartmenta,and is provided with ladderways, <br />whioi- are safe, secure and aooessible; landings <br />are provided in ladderway not to exceed 20 ft. <br />apart; mine has more than one exit for ?mployes~ <br />through the Bessie shaft; and is readily aoceasi- <br />bla ~ employes. <br />S T A T I S T I C S. <br />Average tonnage per month; no tonnage at present <br />Total number of Peet iri shafts ~ 765 <br />Coat per foot $30~ <br />Total number of feet in drifts and levels 2,000 <br />Coat per foot '$10, <br />Total number of feet in erose outs 600 <br />Coat per foot $10. <br />Total mz,ber of feet in winzea and i•aisea 200 <br />Coat per foot $6.00 <br />Total number of feet in development 3,565. <br />MEN EMPLOYED: <br />4 msahine drill men 8 hours at $4.00 <br />1 timberman " 3.50 <br />4 trar~ora " 300 <br />1 ors sorter " 3.00• <br />1 topman " 300 <br />1 engineer " 4.00 <br />1 blacksmith " 4.00 <br />i foreman " 5.00 <br />1 office man " 4.00 <br />Total number o f men employed for the year 16 <br />Coat oP [liel $5.40 per ton average cost per nwnth$150 . <br />Average cost of tlmbare per month $100.00 <br />Average cost of steel per month $35.00 <br />011 overage cost per month $10.00 <br />Coat of powder 12-1~2 ota, average per rnnth$240. <br />