My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00351
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 9:25:48 AM
Creation date
11/18/2007 12:03:51 PM
Metadata
Fields
Template:
Mine Books
County
Summit
Volume
17
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
good <br />by an <br />H.P. <br />sveraoa <br />a .. <br />poll <br />used <br />chile <br />he <br />eta <br />_ _ Nellington Nc. 6. <br />The office of ,the company is not on the .property but ie <br />eituated:Yn the town of Brackenridge. , <br />The blacksmith shop has compressed air connections to <br />the forge ahd hoe electrically driven drill press and grinders <br />and air driven Leyner drill sharpener. <br />The engine room contains an Ingersoll-Rand, Imperial <br />Type 10, air compressor, (cap. 485 cu. ft. of air per min. <br />at 17b R.P.M), which is driven by a b0 H.P. G. E. motor, a <br />pump to be used incase of fire which will handlo 125 gale.. <br />of water. per min., and which is driven by a 10 H.P. G. B. <br />motor. ..Childs chemical tanks are also kept pn hand to be <br />ueed in .case of Piro. <br />Electrical motor. haulage is used Prom No. 2 level, while <br />mule haulage is ueed from level No. 1 whenever it ie necessary <br />to bring ore out by .the way of that level. <br />Ths~eaw-mill hoe ,just been installed and it will <br />undoubtedly prove to bo a great convenience and saving ae <br />it will allow of ell the short pieces of tho large timbers <br />being cut up into head boards and thus utilized. <br />COSTS AND STATISTICS. <br />This property is producing about 35,000 tons of oro per <br />rom <br />year. <br />Tho.timber used .in the mine is cut nearby and hauled to <br />tho mina where it is framed in the company's mill. Tha aoet <br />of the timber alone.amounte to about ;4,000 a year or .12 ].~2 <br />to the ton of ore mined, while Lf the cost of labor in <br />putting these timbers in plsae underground he added to this <br />the .total cost will amount to from 66 to 7b oente per ton <br />of ore minod. <br /> <br />Tha powder costa approxlmately .16 a pound, fueo .60 a <br />hundred feet and nape X1.00 per box. <br />Ooat of hauling ore from the property to the railroad <br />f~verages about .80 a ton and the railroad freight to <br />Denver or Leadville'1s X3.00 per ton. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.