Laserfiche WebLink
le Ca., <br />with <br />share <br />Ideal <br />rl l owe : <br />ye <br />sr- <br />3ady <br />of <br />et <br />sad <br />ey, <br />ad, <br />re <br />-~ --- --- <br />• .. .. MONTEZIIIMA Na. 3 <br />drifting,at .the bottom ie,now be;ng done. <br />Levels 3, 4,_b and 8 are all conneoted and levels l and <br />2 and oanneoted but not levels 2.and~.3. - • <br />Level No, 1 is in s,distance of 150 Peet, No. 2 a distance <br />,oP 250 Peat, Na. 3 e distance oP 800 feet, Na. 4 a dietanoe <br />of 800 feet, No. 6 a distance of 960'feet and $a. 8 a dietanoe <br />of 600 feet, with the vcinze at a point of 300 Feet in. The <br />supper levels are pretty well etoped out. <br />I •. EQUIPMENT. '• <br />The mine. ie'equipped with tunnel house and engine room, <br />•'~blackemith shop,; ore house., and boarding hauee, a-Bletchard <br />(tram, 8200 Pt. long, connects the are house with the wagon <br />Iraed at the f sot of the mountain. <br />The engine room ie equiped wd:th a 10x10 2 drill oompreeear <br />whioh is driven by a 40 H.P. Weeling hauee mat or. The <br />transfarmere stand in the engine raom. <br />The mine ie equipped with care and track and power drills. <br />The winze ie to be egaipped with an electric hoist at anae. <br />MILL. ' <br />This company hoe taken over the mill built Sutton, Steele <br />land Steele and have inetalles Platat'ian machines and will <br />loperate the mill ae auetam mill. <br />Shy oapaoity aP the flotation plant ie 100 tone of crude <br />are and the flow of the mill will be ae fallowe: <br />Prom mill bin to orueher, to rolls, to oard ruffing table, <br />!ta rolls, to oard ooncantrnting table, to short tube milly <br />Ito mixer, to flotation boxes, froth to card slime table, toile <br />Ito oreek. Pulp (lasted about 8:1. <br />OOST AND STATISTIOS. • <br />The oost of mining supplies and timbers ie the same as <br />elsewhere in the dietriot plus the expense of transportation <br />to the mine. Power is furnished to both mine and mill at <br />regular rates. <br />Aoid (10~J~ to ton of ore treatofl, 1 oent per lb. <br />pine 011 (1/4 gal, to ton of ore, treated, 27 seats par gal. <br />Hauling to railroad, X3.00 per ton. <br />