Laserfiche WebLink
S T A T I S T I C S. <br />Total number of feet in shafts. 831. <br />Total number of feot in drifts oould not be asoertained <br />as the greater'.part os the abaft is under grater. <br />Men employed; <br />~ 3 ]liners. $2.7b for 8 hoar shift. <br />i <br />1 F,ngineer~ 3.00 " " " " <br />i <br />1 Pumpman. 3.00 " " n " <br />~~ 1 Superintendent, ---- --- ---' ---- <br />Average number of men employed for the years 6. <br />Cost of fuel per ton, $4.7b. Aver. ooat per mon..$76. <br />n n timber poT in.~ •12• " " " " 20. <br />" " at6e1 per lb.. .11. " " n n 2. <br />n n oil per gal. .60. " " " " 10. <br />" " povrder per lb.. .18. " " " " 30. <br />" " transporting supplies to mine included in above. <br />Average assay valuo of smelting ore per ton, $70'.00. <br />Avosage nesay value of sonoentrating ore per ton, $7.8.00. <br />Cost por toa transporting of ore, $'1.00. <br />Cost per ton treatment of smelting ore, $8.60• <br />Cost pas ton treat~ent of oonoantrating ore, ,9'1.Y.6. <br />QpAgRA7, REMARKS . <br />Thore have been no eoaidonts to report to the enresu of <br />YSaes. ?hs manageoent ie supplied with blank nooident reports. <br />The oompeay loos not oasry indemnity ineuranae against <br />aooident nos eooident insuranoe,tor its omployes. <br />The mnnagednt is taniliar with tho statutes relating to <br />the oDesation of eaetailiterona mines nad aro provided with all <br />asoesesrr blanks and notices. <br />The nine is acrked oontinuonal7 and !a a regnlas producer. <br />so pereoae atsder the sge of tKelve years ere enploye0 in <br />the mires. - <br />. M. <br />