My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00349
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 2:14:22 PM
Creation date
11/18/2007 12:03:44 PM
Metadata
Fields
Template:
Mine Books
County
Gilpin
Volume
13
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICastle Rook - 4. <br />_ E% P Z O S I V E S. <br />i <br />• CaliYornia Giant,- 4(Yf~;.German Inaoloid fuse; 5-% caps and <br />wooden tamping bare are employed. Eaplosivos in exaesa of one dal+'s <br />supply are not stored underground. <br />_ The average.amouat of ezplosivea Y_ept in storage is 100x. <br />'This is atoned in a frame, iron-covered magazine situate 100' <br />vrest of the shaft house and is used for the storage oY powder <br />only. All other supplies are stored in the shaft home. Iio de- <br />vioe Yon thawing pounder has boon provided. <br />Id I Ii l I2 G• & Fd I i1 F. Id E T H O D 3. <br />The main opening is a shaft 4' x 8' in size and 315!, in <br />depth. Tho shaft is timbered with 2-inoh plank for n distnnoo <br />oY 3b' the balanao of the shaft being timbered vrith etttlle. '!he <br />shaft is divided into two oompnrtmonts ono or iahem being used <br />Yor a ladder-way, properly equipped with cafe and eaoessible <br />ladders and has landings ?.0' apart. Tho chart 1s properly aoouro- <br />ed on eaoh side with pillars of grotusd si>Tfiaiont for safety. <br />At a diatanoo of 70' fron the surfnoe the shaft oonneots <br />with a tunnel whioh 10 24U' in length. Ylork was originally anr- <br />ried on through this tunnel but it is novr+taed for an additional <br />exit for the employes and is kept in good oondition and is easily <br />aooossiblo. At a distanoo of 60' trop the shaft a wlnze is s~usk <br />' in the tunnel vrhloh oonnoots with the 140-it. wont level. This <br />wlnze ie being planed in proper condition ne snpidly rse possible. <br />Zevole have boon run rse follows: 140-Zt. level; went, 160'. <br />220-ft. level: oast, 46'; wont, 113'. 30U-Yt. level; oast, 7U!; <br />west, 84'. yrom the 24U-it. level to the rsurinoo on the wont side <br />of tbo ehr-it praotioully all osa of value hna been stopad out. <br />The only aotivo wort. oarriod on is extending the two drifts <br />at the 300-ft. level. bt the tine of this examination the worK <br />of timberiag and oloaning up the debris in the shaft and letels <br />had only been eoaploted. Only n tstsall quantity of ore had boon <br />
The URL can be used to link to this page
Your browser does not support the video tag.