Laserfiche WebLink
. <br />~ M I ft I N G (Continued, <br />Landings are provided in the ladderway not to exceed 20 ft apart. <br />?'hone are winzea and marnrays connecting lovcls, <br />pt'least one msnway is kept in repair and equipped with ladders. <br />The mine is connected with F,liza tunnel. Exit is readily accessible <br />to employea~. LiEhting underground by candles. <br />S T A T I S T I C S. <br />Production, <br />Average tonnage per month 500 tone <br />Development <br />Total number of ft in sgaft 450 ft <br />Total number ft in tunnel 220 ft <br />Total number ft in drifts or levels 7500 ft <br />Total number ft in cross-cuts 400 ft <br />Total number ft in winzos and raises 400 ft <br />Total number ft in development work 8970 ft <br />iden employed <br />4 ?Iinera at $A.00 per dny for 8 hour shift <br />n a,oG <br />1 Trammer' $• " <br />1 Engineer " $4.00 <br />1 Superintendent " $5.00 <br />n <br />Cost <br />Cost of fuel $5,00 Per ton <br />Average coat fuel per month $50.00 <br />Average cost steel per month• <br />7,00 <br />Average cost timber per month <br />G0.00 <br />Average cost oil per month ~ 1.00 <br />Ave raga cost powder per month <br />15.00 <br />Average assay value ore per ton <br />$10.00 <br /> <br />• <br />Coat of mining ore per ton <br />g 2.00 <br />Coat per ton transporting of ore <br />2.10 <br />.Coat treatment of ore per ton <br />$ 5.00 <br />Y;L1 ~ <br />I i` ,~I <br />J <br />i, ~I~ <br />ail <br />„~ <br />I <br />i <br />