Laserfiche WebLink
S U R r A C E P L A N T !Continued), <br />The engineroom,working shaft,blackamithshop and furnaceroom are <br />not all under one roof, <br />Suitable protection against fire is provided, i~r <br />I <br />Office 12 X 16 joins ahafthoune. Dry or changing house is iri shaft ,I','~ <br />house. Timberyard on dump. Ore bin of, 500 tons capacity. <br />iI <br />The water supply is from the city main of Leadville. <br />i I !!, <br />The surface transportation is by waEonroad. ~~~; <br />The ors treatment employed smelting. The mine has no mill or re- <br />dust ion works. <br />E X P L O S I V E S. <br />i, <br />The explosives used are the 40,2 7~8ths Giant powder,capa XXX, <br />il: i <br />B'estern brand fuse. <br />Iran or metal tamping bars are not employed; wooden tamping bars <br />are provided for employees. <br />Powder monkey not employed. ', <br />• i, <br />Exploaivee in excess of one day's supply arc not stored under- ', <br />is ~ <br />ground, Explosives are stored in a magazine provided for that ~~ <br />purpose alone.. The magazine is 200 ft from working shaft or ; <br />other buildings. Amount of explosives kept in storago 400 lbe <br />The magazine is frame 8 X 10 covered vrith iron. <br />i <br />The device for thawinE powder steam heat. Oils,cnndles or other i. , <br />combustibles are stored in building used for that purposo only. II ~. <br />~t ~ <br />1dIN ING ~jl <br />The property is developed by a vertical shaft 4-1~2 X 9,two com- <br />partments,cribbed with 6 X 8 cribbing and is 800 ft deep. <br />The work is carried on at the present time on second lovel,drift <br />ing and raising. <br />;lisps and drawings at office. ' <br />The hoisting method employed cage. Iden are raised and lowered <br />with hoisting machinery weight of load hoisted 1,300 lbs. diptance j i <br />it <br />hoisted 400 ft. The oxble is of steal wire 7~8ths in. and in good i <br />condition. <br />