Laserfiche WebLink
S T A T I S T I C S, <br />Production, <br />Average tonnage por month 600 tons ' <br />i <br />~~ <br />Development, ~ <br />~-~ <br />Total number ft in shaft 300 ft '-'` <br />~ <br /> <br />Total number ft in drifts or levels <br />1,000 ~ <br />Total number ft in cross-cute 250 ft f; t <br />Total number ft winzes and raises 185 ft <br />r. <br />' ';.,~ <br /> <br />Total number ft in development worl 1,735 ft ~~i' ~' <br />.~, <br />Tien employed, ~' <br />4 htinera at $3,00 for 8 hour shifts. ~' <br /> ~, <br />1 Trammer " $3.00 " '.~ <br /> <br />1 Engineer " $4.00 <br />' <br />" ~E~ <br />i5' <br />~ <br />Cost, I <br /> <br />Cost of Ertel $7.00 per ton <br />Average cost fuel por month $28,00 <br />}; <br />Average cost of timber per month $25.00 3 <br /> <br />Average cost of steel per month $10.00 <br /> <br />Average coat of oil per month 2,50 <br />$ I <br />i <br />Average cost powder per month $30.00 ~,, <br />1 <br /> <br />Average assay value ore par ton 30.00 <br />$ 1 1 i <br />~ ; <br />Cost per ton mining of ore $ 1•~ <br />There are no transportation or treatment chargoa on t}ie ore. <br />GENERAL R E1dAR KS , <br />No persona under the age of 12 years are employed upon the mine. <br />All ahafte,pita or other excavations on the property are secure- <br />ly covered or fenced. <br />Strangers or visitors are not allowed underground unaccompanied <br />by ownor or employee deputised to accompany them. All accidents <br />havo been reported to rho Bureau af~Hines. <br />The wino is a regular pro<iucer and is worked continuously. <br />The management ie~familiar with statutes relating to rho opera- <br />tion of metalliferous mines. The property is nor sub-lesaed, <br />