Laserfiche WebLink
~_ i 4:51 <br />STATI ST I C S. <br />Total number of feet in futineis, drifts and ievais 10000 <br />Coat per foot $15.00. <br />Total number of feet it1 raises 2000, per foot $18.00 <br />Cost of powder '~.17 per pound. <br />Cost of transporting ore to smelter $2.00 per ton. <br />Cost of smelting from Sa $2.75 to $7.00 per ton. <br />Average value Af ore per ton $15.00. <br />YEN EMPL DYED. <br />40 miners $3.00 for 8 hours. <br />2 timberman 4.00 <br />2 trammers 3.00 • <br />4 topmen 5.00 • <br />1 foreman 5.00 • <br />G E N E R A L R E M A R K S. <br />Ro per eon under the e~ of twelve years la employed in <br />the mine. Straggers or visitors are not allowed undergr- <br />ound unless accompanied by a competent guide familiar <br />with the mine. All accidents have been reported to t3~e <br />Bureau oP Mines. The management le sugplied with blank <br />accident report e. The mine carries indemnity insurance <br />against accident. The Travelers. The. three main turulele <br />are provid»d with doors at a reasonable distance from <br />entrance to prevent admission of noxious ftmies or gases <br />from said buildings should fire occur. Surface trans- <br />portation is done by aerial wire rope tramway, 3000 feat <br />long, it connects mine with A & R 0 R R. There is no <br />boarding house at mine all empioges board in town a <br />distance of 1~ miles. <br />