Laserfiche WebLink
<br />Average tonnage per month, 1,000. <br />Total humLer of feet in shaft, 450. Cost per foot ~i25.00. <br />Total'feat 1n tunnels .or'adits 9,800. Coat.per•foot p10.00. <br />Total feet iri"drifts or levels, 20,'000. Cost per foot pG,00. <br />Total feet in cross cuts, 500. Cost per foot ~p6.00. <br />Total feet 'iri v~irizes',aud raises,' 3,000.' Cost per' root ;6.00. <br />Dotal feet iri deVelopmer+t, 3,750. <br />P.4en emp'loyed'. <br />1.5 minere~, ~ w$. 00 for 8 haur• si~ift. • <br />2 timbermen, 3.Oq " e ~' ++ <br />2 t ramme r•8 , 3:00 ° 8 " ~+ <br />2 ore sorters, '3.00 ° B ° " <br />1 foreman, 4.00 '~ p '+ n <br />1 £;upt. <br />1 office help. <br />1 assayer. <br />(overage number of mer: emliloyed for the year 25. 5 on suri'ace, <br />and 20 underground. <br />Cost. <br />Cost of timber, X16.00 per frt. 'verage cost per month, ~~300.00. <br />