Laserfiche WebLink
STATISTICS. <br />!aft, sunk free! ~• Average tenna e <br />rT g per month, G00. <br />The srr_i't is Total feet in shaft, 100. Cost ?! <br />per foot ,x30.00. <br />worked. dotal feet in tunnels o,r edits, 12,(100. Cost. per root j6•.00. <br />Total feet in development, 1?,900. <br /> Pden employed. <br /> 17 mine re, ~y3.00 for 8 hour shift. <br />'s, 3 sud 4 1 t_imberman, 3.50 " 8„ " ~~ • <br />b <br /> 1 <br />laclismitn, x.00 ~' 8 ~~ n <br /> <br />a'll connected 1 foremm~, <br />nce, Del ~ronte, Avar~~,~numb~ ~~a!~t,_~`mp~~yed i'or the year 1E1. All underground. <br />in, which ie knn Cost. <br />the silver valu Cost of timber 18.00 per M. Average cost per month, <br />' ?180.00. <br />e Cost oi <br />steel 12~ per lb. <br />from the Bachel Cost of poprder, W1G.00. Average cost per month {p80.00. <br /> Coat of trassportiitg• supplies to mine ?.5 c! per cwt. <br />nels are all Avera~;a coat per mouth, ,N?•2.75. <br /> Averap;e assay value of ore ~rer ton, x17.00. <br />a in. The Bachelor Cost per ton miniry; of ore ,2.00. <br /> Coat of transporting ore X4.00 per ton. <br />anels. Cost per ton treatment.of ore X7.00. <br />uey emnloy no <br />tt,•1 e. <br />.s sufficient. <br />end are in rcooA <br />loaned from <br />care are Truax, <br />e is of 12 lo, <br />and intermedia <br />met with. <br />ndergrou!td rrm•- <br />nd is pt•ovidad <br />accessible. <br />rt !tone at pre- <br />:artces not ex- <br />tect levels, <br />led with ladders <br />s 1, 2, 3, and <br />lousht. <br />