Laserfiche WebLink
manrvrays srarsncs. <br />, <br />.h ladders. <br /> Production: - A verage tonnage per month, 1000. <br />i to the <br /> Development;- <br />accessible <br /> Total feet in shafts 40 feet. Cost per foot ;15.00 <br /> Total feet in tunnels or ~idits, 4,500. Cost per foot ?j6.00. <br /> Total feet in drifts or levels, Cost per foot 16.00. <br /> Total feet in vrinzes and raises, Oost per foot y4.00. <br /> Total fast irr development, 6,040 <br />Prten employed. <br />35 miners (1 ~p3.00 for 9 hour shift. <br />4 tranuners, <br />2 eu;;inesre at mill 3.00 " 10 " " <br />2 Y'orsnten, 4.00. <br />1 Supt. <br />12 mill:nen, 3.50 i'or 8 and 10 Hour shift. <br />Average numbor of men employed f'or tae year FiG. <br />41 uudergrouud :and 15 on suri'acs. <br />Cost. <br />Average cost of fuel per morrth, ~400.OU. ' <br />Cost of timber ~1G.00 per ht. average cost per month, ~yl?5.00 <br />Cost of steel ~ per lb. <br />Oost of oil 40,, per gal. Average cost por monti~, ;~?5.00. <br />Cost of povrder 16~ per lb. Average cost per month ?60.00. <br />Cost trazrsporting supplies to mine G5~' por ton. <br /> <br />