My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00279
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 11:18:57 AM
Creation date
11/18/2007 12:00:45 PM
Metadata
Fields
Template:
Mine Books
County
Mineral
Volume
6
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
manrvrays srarsncs. <br />, <br />.h ladders. <br /> Production: - A verage tonnage per month, 1000. <br />i to the <br /> Development;- <br />accessible <br /> Total feet in shafts 40 feet. Cost per foot ;15.00 <br /> Total feet in tunnels or ~idits, 4,500. Cost per foot ?j6.00. <br /> Total feet in drifts or levels, Cost per foot 16.00. <br /> Total feet in vrinzes and raises, Oost per foot y4.00. <br /> Total fast irr development, 6,040 <br />Prten employed. <br />35 miners (1 ~p3.00 for 9 hour shift. <br />4 tranuners, <br />2 eu;;inesre at mill 3.00 " 10 " " <br />2 Y'orsnten, 4.00. <br />1 Supt. <br />12 mill:nen, 3.50 i'or 8 and 10 Hour shift. <br />Average numbor of men employed f'or tae year FiG. <br />41 uudergrouud :and 15 on suri'acs. <br />Cost. <br />Average cost of fuel per morrth, ~400.OU. ' <br />Cost of timber ~1G.00 per ht. average cost per month, ~yl?5.00 <br />Cost of steel ~ per lb. <br />Oost of oil 40,, per gal. Average cost por monti~, ;~?5.00. <br />Cost of povrder 16~ per lb. Average cost per month ?60.00. <br />Cost trazrsporting supplies to mine G5~' por ton. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.