Laserfiche WebLink
i <br />STgT1aTICa. <br />'t • No <br />s provided <br />iasible. <br />landings <br />:t apart, <br />. shaft <br />Development. <br />Total No. of feet in shaft, 420. Cost per root p35.00. <br />T+fen employed. <br />3 machine drillmen, 5}4.00 for H hour shift. <br />3 machine helpers, 4.00 " 8 " " <br />1 timberman,. 3.50 " 8 " " <br />2 tpp men, 3.00 " 8 ^ " <br />5 laborers, 2.50 " 8 " " <br />2 engineera,• 5.00 " 12 " " <br />i pumpman, 4,00 " g " ~~ <br />1 blacksmith; 4.00 ° 10 " " <br />1 foreman, 4.00 per day <br />1 Supt: 5.00 per day. <br />1 office help, 50.00 par month. <br />Averap;e number oi' men employed for the year, 21. <br />9 underground and.12 on surface. <br />Cost. <br />Cost of fuel, Coal X4.00 per ton. Average cost ner month, ?$120.00. <br />Cost of timber, ;18.00 per M. hverag;e coot rer month, .j300.00. <br />Cost oY steel, 12~! per lb. <br />Cost of oil 65~ per gal. Averap;e cost por month, X13.00. <br />Cost of powder 16r par lb. Ave Page cost per month X60.00. <br />Cost transporting supplies to mine, 30~! per curt. Avora~e coot per <br />month, "12.00. <br />