My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00279
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 11:18:57 AM
Creation date
11/18/2007 12:00:45 PM
Metadata
Fields
Template:
Mine Books
County
Mineral
Volume
6
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STATISTICS. <br /> <br />production. <br />Avera{;e tinrraEye per month, 2,000. <br />Development. <br />Total No. feet iu Chance shaft, 1,500. Coat per foot ip2.5.00 <br />Total feet in tunnels or adits, 900, Cost per foot ~B.00 <br />Total foot, in drifts or levels 2,500. Cost per foot ~~"7.00 <br />Total feet in cross cuts, 300 Cost per foot .";8.00 <br />Total feet in vrin~es and raises 2,000', Cost per foot ,x'6.00 <br />Total PIo. of .feet in development, 7,'?.00. <br /> Men emploed. <br />20 miners, OO f,~"3.00 for 0 _2ottr shift. <br />1 timberntaxr, 3..50 " A " ~~ <br />4 t ramme rs , 3.00 " 8 " ~~ <br />2 ore sorters, 3.00 " 6 " '~ <br />1 topman, 3:'00" " 8 " ~~ <br />1 enUineer, ~b:50 " 8 " " <br />1 blacksmith, 4.00 " 8 " "" <br />1 foreman, 1.00 per day. <br />1 Supt. :.;50.00 pe r mwai7, <br />Avsrrap;e number oi' meu employed, 2A. On surface, 9; under[rronnd 20. <br />Cost1 ~ <br />Cost of fuel, ;5.00 per ton, averaf•s cost per month, f?210.00 <br />Cost of timber 16.00 per M. AveraF^s cost per month,~150.00• <br />Cost of steel, 12~ ~rer lb., Averar!;a cost per month, ,x6.00 <br />Cost of oil, 40~! per dal, Averap;o cost per month ?20.00 <br />Cost of powder 14 1~2~ per lb., Avera('.;e coot per month, 5P150.00 <br />Cpst transportin3 supplies to mine 30!~ per curt. Average cost per <br />month, ,°`p8.00 <br />Avsrap;e assay value ore per ton, 16.00 <br />Cost per Lon minim of ore ?2.25 <br />Cost per tor: transportirrp; ore, by vrr~{;on N1.15, by railroad X3.00. <br />Cost per ton treatment of ore y5.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.