Laserfiche WebLink
` SURFACE PLANT. <br />atrilces They. have twee Hendey and Meyer, HO Fi.F. boilers. Spring <br />et, vrater'is used anr' a pressure of 90 lbs. is carried. The boilers <br />ersge vrere last inspected Dec, let,, 190~t. Coal is used for fuel. <br />• The hoisting engine is a Hendey and PI!e}rer <br />14 x 20 <br />? <br />b <br /> , <br />, r <br />ou <br />le <br />t to the drum, link motion vrith a square clutch and a^i~rak©. It is e <br />uip <br />ed <br /> q <br />p <br />1 and with a positive indocator in plain vievr of the engineer and is <br /> operated at the ermine. The engineer is 3G years of age and hus <br /> had 15 years of experience ae an engineer. He is not addicted to <br /> the use of intoxicating liquors. <br /> The shai't house is 24 x G4, vrood. The head frame is tyro post, <br /> 14 x 14 and 12, x 12 angle braces, 25 feet nir;h. mhe sheave wheel <br /> is G' 6'!, rope filled. T'rere is a chain around the collar of the <br /> shaft to prevent persons from tripping; and falling into shaft. <br /> The smith's shop is 20' x 20' frame building. Tile eni;ine <br /> roan ie 34 s ?.G', and the boiler room 2G~ x 50' The engine room, <br /> vrurking s%i.i't, blaclcs;nith shop and furnace room are a1.1 under oxre <br /> roof. 'I!i:ere is no suitable protection against fire. <br /> The dry or changing 3:ouse is 16' x 20' frame building. The <br /> offices are in the shaft hmuse and are 10' x 12'. <br /> There era five oro bins. The ore house is 18' x 100' frame, <br /> . The ureter supply is from a sprinp~ at the head of West "'1llavr <br /> Creek. The lighting ie by gasoline larrpe, <br /> The surface transportation is by vraptorr road. <br /> Most of the ore is senYt to the smelters, she mires iras no mill <br /> or rerluation works, <br />All buildings are covered witi: cortug=ted iron. <br />