Laserfiche WebLink
sraresncs. <br />by hand <br />d., 4th., Production. <br />- Average .tonnage per month, 2,000. <br />'l hand <br />cars, of Development. <br />and 'Dotal i'eet in .drifts or levels, 2,800. Cost per foot, X8.00. <br />-~ Total feet. in cross cute, 300. Cost per root X8.00 <br />cQ•uP- 'Dotal faob in rvil}zes~and raises 2,000. Cost per foot ?}6.00. <br />1• Total. feet in devoloprr.ent, 5,100. <br />-under- ]u*en employed. <br /> 25 miners, O X3.00 pfr day. <br /> 1 ti~sbermaai, 3.50 " " <br />,rovided 4 tram~:ers, 3.00 ° " <br /> 1 ore sorter, 3.00 " " <br />~ no 1 foreman, 4.A0 " " <br /> 1 Supt, ;125.00 per moiaii. <br />ripes. <br /> Average number of men employed i'or the year, 31. <br />~.ast one 30 underp;round and one on surface. <br />exits acs Cost. <br />d Com- Cost of fuel ~c8.00 per ton. Averal•e cost per month 5s 7.40.00. <br /> Coat of timber u1600 per Pd. Average cost per month, }200.00. <br />ly Cost oi' steel lE~! per lb. P.veral?;s cost per month, ,yG.00. <br /> Cost of oil, 40 par gal, Avern~;e cost per month, 20.00 <br /> Cost of pov~der, 141 per lb. A.vera~*e co~;t per mwtth, y300.00. <br /> Cost transporting supplies to mina 30(~ e'er cwt. Average cost per <br /> month X8.00. <br /> Average assay value ore per ton, ,120.00 <br /> Cost per tun mininE; of oro ;;p2.7.5. <br /> Cost per ton trans;portinf; ore by wa~~on rp1.15, by railroad ~p3.00, <br /> Cost per ton treatment of ore u`7.00. <br />