Laserfiche WebLink
<br />srnnsrws. <br />00 gallons Total production for 1903, 4,000 tuna at X30, per ton. <br /> DEPEI,UPMENT <br />is Total No,feet in shafts, 9b0, ooe t per ft. X30, <br />tion is ++ ++ .. „ adit 1300, 6 <br /> „ <br />placed ., ., drifts or level 6090, 8 <br />5 <br /> , <br />0 <br />xo, oooas- +' ,+ „ winzes so raises 900, <br />„ <br />., ., <br />10,00 <br />:e Pelt. ++ ., „ development, 9240 <br />.0th levels, MEN EI~rtPZOYED' <br />vela, 4b miners, $2,7b per day for 9 hrs, shift, <br />of <br />1 timberman 3, <br />9 <br /> „ <br /> 3 trammera 2,78 <br />9 <br />8 through " +, ., <br /> 7 ore sorters 2,80 <br /> <br /> 1 topman 2.50 „ 9 <br /> <br />ontgomery „ „ „ <br />++ <br /> 2 engineers 3,28 1 2 <br /> <br />ndlea are „ „ „ „ <br /> 1 pumpman 3, <br />9 <br /> „ .. <br /> 2 blacksmiths, 3, g <br /> „ ., .. <br /> E foremettt 3,50 g <br /> „ + <br />1 superintendent, <br />C 0 S T S, <br />Coal ~4,1b per ton, Av, oost per month, 200, <br />Timber l0 ote, per inch, 36, <br />Steel, 9-1~2 ots, per lb, 25, <br />011, 30 ate. per gal, 10. <br />Powder, 13-1~2 ots, per lb. 350, <br />Transporting ore to sampling works or Mill, 36 ots, par ton. <br />Cost of smelting ors, par ton, ~7,b0. <br />