Laserfiche WebLink
<br />I <br />'The average tonnage is 250 <br />IIo. oY Yt, in shafts, 350, <br />" ~ " " " drifts, 1100, <br />;Total uo. feet in develorc~ <br />~il~p. <br />3 Z:aohine Drillmen, <br />i <br />~1"Tirbersan, <br />1 Tratr~er, <br />4 Ore Asaortera, <br />1 Tonz7an, , <br />1 Enginoer, <br />1 Sunorintendent, <br />STATI5TICS: ' <br />tons per nonth. <br />Cost per Yt, N40 ,00 <br />" " ~" ~'$ 6`00 , <br />ant is 1450. <br />$4,00 for 8 hear shift, <br />,°i3:b0 " " d ~~ <br />v3 ,00 " " <br />'`3.00 ~ ,. ~~ ~. <br />$3.00 " ~~ ~• ~~ ' <br />vb .00 " <br />The average nunber oY r.;en erployed for the year ie 12 <br />6 underground and b on the surface. <br />Coat. <br />Fuol x5.60 per ton. Ave. Cost por ro. $b0.00 <br />Tir^ber, x32,00 por LI, " x34.00. <br />Steel, Op1~2 ¢ per 1•b. ~! y6,00, <br />Oil, 70~ per gal. " " x4,00, <br />Powder, X12,50 per arrt . " x110 ,CO , <br />Average assay valuo of the ore per ton io $28.00 <br />Cast par tot: oY rining tY.o oro~ ;110,00 <br />Coat per ton for tranapertlag the ore by cragon 65~ <br />to tho Rnilroad e~ Freight X7,50, <br /> <br />