Laserfiche WebLink
SURFACE PLgNT. <br />ere i s one Scotch Elarine 60 H.P boiler used. <br />s water used in the boiler is obtsined from bltman. <br />1 pounds pressure is carried. <br />a boiler was last inspected on July 11th, 19.'07. <br />ne Rand 1Ox12x14, Three Drill capacity 6ir Compressor is <br /> <br />Coal i s used for fuel. <br />sating Flant. <br />Steam rioistizlg engine, vulesn, 6x8 is employed. <br />The hoist is egnipned with a positive indicator in plain <br />veiw of the engineor, who operates the engine at 'the engine. <br />1'he Engineer is 23 years of age and has had six years ex- <br />~perienc a as an engineor. ~,e is not eldicted to the use <br />Hof intoxicating liquors. <br />,The Engine Room, Boiler Room and blacksmith shop is a <br />',building 16x32. The head frame consists o Y 4 poets, <br />8 in. x 91n., 20 feet high. <br />;The Sheave wheel is a•30 snob rope filled. <br />! `s'he collar of shaft ( where buoket is uaedl is oT sufficient <br />!'height to provont persons from tripping and falling in the <br />shaft, and is provided with a g^od and sufficient deer <br />to provont any materiHl from fs ling in the shaft Yrom <br />dumpitte. <br />The Engine Room, D1acYsnith Ehop and furnace room are <br />ell under one roof. <br />Tho protection egalttat fire is only Yair. <br />Tho Engine room 1a used for a ohnnging room. <br />Thoro is one ore bin, 14x24. <br />' Tho water aunply is obtained from the hltman 17ator Co. <br />Tho Lighting is obtained from the Pueblo & Suburban Traotion <br />Ic ligh tang Company. <br />The Ore is treated by Lulling. <br />i <br />5 <br />