Laserfiche WebLink
SURFACE PLANT. <br />tr. ' ~ <br />ne 80 H.P. Tubular and tyro 40 g,g, Economic iioilers are <br />;used. <br />The hater sided in the boilers is obtained fm m then l.ltman <br />i7ater Company. 90 pounds pressure is carried. The boilers <br />inspected in June; 1407, <br />rwalk 16x16, six drill capacity hir Compressor is used. <br />Coal is used for fuel, <br />jHoiating Flsnt. . <br />jEline FC Smelter, Geared, Stean Hoisting Engine is used. <br />;The Hoist is equiZ,ped :~rith positive indicator in plain <br />Jr <br />'veiw of the engineer, rho operates the engine at the <br />jengine. The engineer is about 45 years of age and has had <br />about eight years ox~:erience as an engineer. Fie is not <br />laddicted to the u;:o of liquors. { <br />The Engine ?oom is an 1©x36. Frer..e Building. The head <br />frsr..e consists of t::o Hosts, loin x 10 in.- 36 feet high. <br />The Sheave 19hee1 is a 42 inckr ropy filled. <br />Tho Collar of shrift(where bucker is used) is of auffioient <br />hooght to prevent persona frorn tripping and falling in <br />the shaft and io provided pith a good and sufficient door <br />to ~,revent any rratorial from falling in the shaft Prom <br />dumping. <br />The Blackamith'o,5hop is a 14x20, Frame Building. <br />The Engine mom, 3lacksmith :'hop and furnace room are all <br />a <br />under ono roof. Fair protection ap~nat tiro is provided, <br />The liry and C}ranging P.oom is 14x14; the office is 6x©; <br />stables. 8x10. <br />!'hero are two ore bins, iho ore house is 36x40. <br />The water supply is obtained from tire t.ltman 1.ator Company. <br />Tho bighting obtcinod from The Pueblo d; Suburban Traction <br />fc bighting Com~,any. <br />Tho Ora is treated by :.molting and iiilliag. <br />Tho i:ino has no r. ill or reduotion ::orYs. <br /> <br />