My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00208
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2009 8:54:44 AM
Creation date
11/18/2007 11:58:16 AM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
15
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~Jb <br />2 ~ ~~ <br />Under ,I, <br />ground tramming,Drainage,and Ventilation. <br />Same ae report of 2912. L; <br />Exits. <br />Same ae report oP IgI2. <br />Lighting underground:-Oandlea. <br />Stati9tios. <br />'Average tonnage per month:-I00.6roae:.tonnage per year:-I200. <br />Developement. <br />Total No.of feet in 9haft0:-420.-CO9t per foot:-gIffi.00. <br />n n n n x leVe10:-j000. n n n :_6.00. <br />n u n n n UPral9ee:-200. " " ~" :-x],00. <br />Total No. of feet in developement:~620. <br />Lien employed. <br />Miner9. X3,50. per day. 8 hour 9hift.~ <br />I FOrema~l. #5.00, n n g n n <br />I Engineer. ~4. 00, n n g n n <br />Average No.of men employed for the year:-9. <br />Oo9t. <br />ooet of fuel:-~5.50.per ton-Average ooet per month:-$I2o.0o. <br />" timber-#22.per I000. ~' " ~~ '~ :-#60.00. <br />" ~' powder-14 Ote:gar lb. 9 ~r ~r n :-X75,00. <br />average value of ore por ton:-~g.5o. <br />Cost per ton mining ore:-~I.00. <br />" " " tranoportation and treatment:-X5.00. <br />• aenerel remark9. <br />Seme ae report of 1912. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.