Laserfiche WebLink
^ <br />41:i lii <br />~2) <br />Exits. <br />.Same aq report of 191I. ~~~ <br />'Lighting underground:-Eleatrioity and oandleq. <br />Statlgtloq. i' <br />Average tonnage per month:-I200-Oroes,tonnaga~per;year:-14.500 <br />Developement. <br />Total No.of foot in ghafta:-850.Oogt Per foot:-$I6.00. <br />n " " " " levels:-I200. " " " :-$6.00. <br />" " ~ " " raiseq:-50o, " " " :-$5.00. <br />Total No.of feet in developement:-1470. <br />lien employed. <br />16 Maohine drilimen. 83.75• Per day. g hour shift. <br />2 " holperq. $3.00. " " g " " <br />I <br />20 <br />i <br />ltinara. 83.00. " " <br />B " <br />" <br />. <br />I8 <br />Trammerq. $3.00. " " <br />g " <br />" <br />5 ore aggortarq. $3.00. " ~ " " <br />2 Topman. $3.50• " " 8 '~ n <br />2 Engineerq. 84.50. " " ffi " " <br />I Dlaokgmith. $tE.50. " " B ° " <br />I Foremen. 85.50• g ° n <br />2 Timbermen. $3.50• " " g ~~ ~~ <br /> Average No. of men employed for the year:-70. <br /> Oogt. <br />coa t of fuel:-$4.50.per ton.-Average oogt Per month:-$150.00. <br />" " Dowder:-I4 I~2 otq per lb." " " " ;_5700.00. <br />" " timber:-$22.per I000. " " " " 8350.00. <br />Av erage aggay value Of ore:-$15.o0.per ton. <br />co at gar ton mining ore:-$3.50. <br />" " " transportation and treatment:-$7.5U. <br /> oaneral ramarkq <br />so ma aq report oP 191I. <br /> <br />