My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00208
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2009 8:54:44 AM
Creation date
11/18/2007 11:58:16 AM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
15
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) <br />Exits. <br />3eme as report of 2912. <br />Lighting underground. <br />391 <br />I!Electrioity and oandles. <br />statiatioa. <br />Average tonnage per month: j00.-Grose tonnage per year:-3600. <br />Developement. <br />Total No. of Peet in ehaPt:-600.-Oost Par foot:-$25.00. <br />n n n " levels-3700. " n n ;_97.00. <br />„ n n " " OrOSSOUta.I000." " " :-g 8.00. <br />~ Total No.of Peet in developement:-4700. <br />Man employed. <br />2 Maohine drillman. 83.50• Per day. 8 hour shift. <br />83. oo. " " g ~~ ~~ <br />16 Miners. <br />n „ B n n <br />3 Trammara. 83.00. <br />83. oo. " ~~ ~ n " <br />2 ToPmen. <br />84.00. n n 6 n n <br />I Engineer. <br />E4. 00. " " 8 ~~ " . <br />I Pumpmam. <br />~iF.00. " n 8 „ n <br />I Hlaoksmith. <br />Average No.oP man employed for the year:-26. <br />Oost. <br />Cost of Yuel:-85.5o•Per ton.-Average oost per month:-8200.00. <br />„ „ .. ~' : -8500.00. <br />n " timber-822.per I000. <br />„ „ .. ~~ : -8125.00. <br />" " powder 14 ots.per lb. <br />Average assay value oP ore:-#16.00. <br />Cost per ton mining ore:-83.50• <br />Coot par ton transportation ens treatment:-86.00• <br />General remarks, <br />Samo as report oP 1912. <br />
The URL can be used to link to this page
Your browser does not support the video tag.