Laserfiche WebLink
sus !; I!!i;?~!'. <br />(2) <br />i <br />Mine methods. <br />No ore is being extracted at presant~ the work being done being ~I <br />Ieimply preparatory to'sinking the bold Basin shaft. i <br />Underground tramming,Drainage and Ventilation. <br />Same ae report of 1912. <br />Exits. <br />Same as report of 1912• <br />Lighting underground:-gYstem employed-candles. <br />Statistics. <br />No production at present. <br />Developement. <br />Total No. of feet in OhaftO:-I250.-Oost Per foot:-X25.00. <br />n n n n " level0:-3500.- " " " :-fffi.00. <br />n n " raises:-250. " " " :-$7.00. <br />n n <br />Total No.of Poet in dovelopement:-5.000. <br />Men employed. <br />b 1linere. ;3.00. per day ffi hour shift. <br />n " b' " " <br />2 Topmen. 13.00. <br />4.00. ° n ~' " " <br />2 Rngineere. 1 <br />Average No.af men employed for the year:-I0. <br />Ooet. <br />No estimate of oost,as worK on Property has Just commenced. <br />General remarks. <br />Same as report of 1912. <br />;I <br />