My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00197
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 9:03:33 AM
Creation date
11/18/2007 11:57:54 AM
Metadata
Fields
Template:
Mine Books
County
Gunnison
Volume
13
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />~ M I N I N G AN D M I N E M E T H O D S. <br />The main opening is a cross cut. tunnel 3920 Peet in length <br />where it taps the Gold Links vein. From this point of <br />.,,, .~ <br />I intersection the tunnel is, driven on the vein in a <br />northerly direction a distance of 4000 Yeet. A11 vein <br />matter is taken out for 1600 fePt_ long and an average oP <br />200 feet above said tunnel,, this is where sloping is <br />still carried on. The method of ore. extraction is over hand <br />sloping and d~Eifting with ,air drills. Ingersoll Reald air <br />drills and Waugh elopers. ~'he method of timbering 1s stulls <br />and square sets covered with lagging. The timbers are pine <br />~ and spruce, prepared at thY saw mild on dump. Underground <br />tramming is done by hand a;!d horses,, One ton steel ears <br />are used for tramming. Chutes are loaded by hand,,and <br />gravity. The system of vent~iiiation.is natural with an air <br />shaft through t o surface 4000 feet from entrance of <br />turmoel. Candles are used for lighting underground. <br />The mine has two exits one through the air shaft with a <br />good manway with ladders and. landings ,20 feet a.pa~t.and <br />I in good condition and. rest~y atr all timgs for employe®B. <br />I H 0 I S m.I $ G. , <br />Method employed air he~st,shaft 70 feet deep, weiF.ht of <br />load hoisted 1500 with a new steel cable only u$ed three <br />J months, humble hook .i~..,used to prevont over v~ir~ding, <br />wire bell line is used, bell 6" gong.. Code uaed_is. <br />regular code, signals are posted in engine room and at <br />collar of shaft. No ,wore .than three pexsons axe alloe¢ed <br />, <br />to ride a a bucket at one t,i.Tae~., Bue}~et way ~s,,],ned with <br />,.. <br />fiiank on the inside from bottom of shaft, drifts are <br />being driven both ways on Goid Links vein. <br />- ; <br />S TAT I S T I C S. <br />Gross tonage from 1500. to, 200,0 tons per. month,,. <br />D E V E L 0_P,_E M.E N T. <br />;Total number of Peet in abaft 70 feet. <br />Total number of feet in Baits 86. _A, <br />Total number of feet in drifts or ~evels.,43?5, <br />Total number oP,~eet in crosscuts 3920, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.