Laserfiche WebLink
(2) <br />18 700 feet in depth and is connected at the G00 and 700 foot <br />levels with the wolf Tone,Adams,and Waterloo shafts. <br />Hoisting. <br />3ame as reports of 1912-i3. <br />Mine methods. <br />I' Method of ore extraction:-3toping and drifting-No maohine drill <br />empioged-Single hand drilling used. <br />Timbering:-Square setts and Dribs used sufficient) <br />Underground tramming:-Lien with ordinary mine oars on i2'lb.to <br />the yard rail-NO water handled-zJentilation,natural draft. <br />Exits. <br />~~ Shaft is divided into two oompartments with good ladder wey- <br />Exits on two levels with other shaft connections. <br />j Lighting underground:-Eleotrioity and Dandles. <br />StatistloA. <br />I <br />I~ Average tonnage per month:-IOOO.Gross.tonnage per year:-I2.000. <br />', Total No.of Peet in shaft:-700.-Cost per foot:-tIS.00. <br />~' n " " " " levels-5500- " " " :-#5.00. <br />!~ " " " " " developement:-6200. <br />Men employed. <br />14 Miners. #3.00. per day. 5 hour shift. <br />2 Timbermen. #3.00. " " 5 " " <br />2 Trammera. 13.00. " " ~ " " <br />I Engineer. #4.00. " " 5 " " <br />I Foreman. #4.00. " " 5 " " <br />Average No.of men employed for the year:-20. <br />Cost. <br />Cost of timber,#22.per IOOO.Average cost per month:-#400. <br />', " " pOwder,14 Ots.pex lb. " " " " :-1100. <br />Average assay value of ore per ton:-#I2.50. <br />Cost per ton mining ore:-~ 2.50.Cost pex ton transporting ore <br />13.50.Cost per ton treatment:-=2.50. <br />~ General remarks. <br />Ilsame as report of 1912-13. <br />