Laserfiche WebLink
(2) <br />Mining, <br />The main working shaft at present ie what is known as the ao]d <br />Basin shaft whioh is X50 Peet in depth,and is oonnootad at the <br />bottom level by a drift 700 feet in length with the Big Four <br />shaft which is S00 feet in depth the latter shaft having a aur- <br />faoe elevation oP 350 feet abovo the ool?.ar oP the Gold Basin <br />abaft,both shafts being on the same proporty. <br />Hoisting. <br />1Cethod employed-maohinery driven by ateam,by which men are iaiaed <br />and lowered-Distanoe holsted,400 feet-Height of load,2000 lbs. <br />Oable I inoh ateel(good),material hoisted from one level-Bell <br />line 3~g manilla-Mining Bureau oode of signals uaed,whioh are <br />posted in engine room and oollar of shaft-~ <br />kSine methods. <br />No produotion oP ore at present tiae,force engaged in oleaning up <br />and reaira to ahaft.No water handled-Ventilation,natural draft. <br />Exits. <br />Shaft is divided into two oompartmenta,with ladder way in good <br />condition-Oonneotiona made with other shafts on property. <br />No produotion. <br />Same ea xeport oP 1913. <br />7 Miners. #3.00. <br />2 Timbermen. #3.50. <br />I Foreman. #5.00. <br />Statistics. <br />Development. <br />Men employed. <br />per day. <br />~~ <br />n <br />g hour shift. <br />g n n <br />s <br />Sverage No.of men employed for the Yesr:-I0. <br />Qoat. <br />No record of coat at present-No produotion. <br />General ramarKs. <br />same as report of 1913. <br />