Laserfiche WebLink
^ <br />STATISTICS. <br />Total No, feet in shafts 734, Av, coat per ft. ~2b.00 <br />„ „ drifts 6135, „ 7.50 <br />„ „ ., „ tirinzes 565, „ „ ,,.. 25.00 <br />„ „'develop'mt 7434, „ <br />PdEN II~IIPI.OYED- <br />16 miners, x"2.75 per day of 8 hours. <br />1 timberman, 3.00 „ 8 hours. <br />3 trammera 2,75 8 hours <br /> . <br />2 engineers, 3.00 12 hours. <br />1 Superintendent 5.00 „ <br />Av. mm~ber men employed, 22. <br />COSTS- <br />Coal per ton, X6.50, average cost per month, X150.00 <br />Timber per inch, 10 cts. „ 20.00 <br />Steel, per pound, 15 ets. „ „ 10.00 <br />Oil, per gallon, 65 ots. .3.50 <br />Powder, per lb. 14 eta. 7b.00 <br />Av, assay value ore per ton, 1bo.00 <br />Coet per ton transporting ore, ~1 <br />„ treatment of ore, Pdilling,Qp1.50. Smelting,~7,60 <br />NOTE. Two blocks of ground, (small) are sub-leased to <br />parties, vaho pay a royalty to the leasers. <br /> <br />.,'': <br />