Laserfiche WebLink
' ~~ 10 <br />6 expenses uotad inchtde straightening and taking up the Noor of the old tunnel and drifts, <br />' ~ ~ relaying with new track and heavy rails, and running air and ventilating pipes into <br />~ ~•. <br />the workings. <br />CLDORADU GROUP. <br />~' Pi'ork from the surface on this group can only be done during the summer mwtthe, <br />During tlxe month of June the tunnel was extended 52 ft., and is still being oarrfed <br />•-~-~- forward as fast ae possible, lVe havo not met with the encouragement on this property <br />that wo bad reason Co axpact Frem the appearance of the vein at the lima the bond was taken. <br />CONSTRUCTION WORK, <br />Tho close of the fiscal year finds us with hhe woth pertaining to the erection of a <br />new GO-stamp Mill, with the nocessm•y Mine and Dlill buildings, well advanced. Tho ls6 <br />of November should sac the virtual completion of the work, and at that Uimo it is hoped <br />that all worlt pertaining to the opening np of the Argentine Vein from She Cincinnati Level <br />will be completed, and everything in readiness for the crushing of me. <br />I w•ioh to axproas my thanks Eo the Baard for the uniform ]cindness I havo rocaived at <br />their hands, and tha support 66ey havo given me, and also at this time £o exprase my eincera <br />appreciation of the loyal aseistauee I Nava received fcmn the members oP Ube Company's staff. <br />Yours faithfully, <br />J. IiPRRCN, <br />~,_ Mataapn•. <br />_ ... <br />