My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00149
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 11:06:18 AM
Creation date
11/18/2007 11:55:56 AM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"iU~ <br />as well as single hand drilling are employed Timbering <br />by skulls and lagging and is sufficient, timbers uae8 <br />native spruce and pine; Chutes are loaded by gravity <br />and hand. Underground tran7eing with oars and 8~ T-rail <br />track. Ventilation is by connection vrith other mines. <br />Noxious gases are met with. Sanitary oondit ion is fair. <br />Shaft is.divided into three compartments and is provided <br />with ladderways whiog are safe, secure and eooeasibla <br />and landings are provided not to exceed 20 ft. apart; <br />there are wlnzea and manwaye oonneoting leveie,and at <br />least one is kept in repair and equipped with ladders. <br />Pine has more than one exit for employees, by connection <br />with the John A Logan and Lucky Ou6 No 2 shaft, and all <br />are readily eooeasibla to employes. <br />S T AT I S T I C S. <br />Average tonnage per month 300. <br />DEVELOPYFNT: <br />Total number of feet in shafts 3,300 <br />Cost oar foot X30. <br />Total number of feet iil drifts and levels 6,000 <br />coat per foot #10. <br />Total number of feet in cross outs 2,000 <br />Cost per foot X10. <br />Total number of feet in winzea end raises 200 <br />coat per foot ~9. <br />Total number of feet in development 11,500 ft. <br />1[N~f FDQ'LOYF.A: <br />8 machine drill men <br />6 miners <br />2 timbermen <br />3 trammere <br />s ore sorters <br />1 topmen <br />i engineer <br />8 hours ~ 4.00 <br />• 3.00 <br />• 3.60 <br />• E.00 <br />3.00 <br />• 3.60 <br />• 5.00 <br /> <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.