Laserfiche WebLink
6:1 ~ <br />employed; timbering by atulls and lagging 2nd is <br />suffioient,timbers used native spruoe and pine; ohutea <br />are loaded by p~ravity and hand; underground tramming by <br />care; 8~ T:rail track Ventilation by oonnection vrith <br />other mines and is sufficient; no noxioiis•psaes are <br />met vrith. Sanitary condition good. Shaft is divided <br />into tiro compartments and ie provided ¢~ith manway and <br />ladderways,tshich ass safe, secure 2nd. aooessihle. <br />S T A T I S T I C S. <br />Average tonnage permonth 600. <br />Number of feet in shafts 1290 <br />Cost reT foo t $25.00 <br />Total mrmber of feet in drifts and <br />levels 5000 <br />Cost per foot $7.00 <br />Total number of feet in ciro as-cuts 2500 <br />Cost per foot $8.00 <br />Total number of Peet in winzea and <br />raises 1000 <br />Coat per foot $7.00 <br />Total number of feet in development 9,790 <br />MEN EMPLOYED: <br />6 Machine drill men 8 hours $ 4.00 <br />20 miners " 3.00 <br />3 timbermen " 3.50 <br />6 trammera " 3.00 <br />5 ore sort era " 3.00 <br />2 topmen " 3.00 <br />1 englneer " 4.OU <br />Average number of men employed for the year sYx 43 <br />Average coat of fuel per month $160. 00 <br />Average coat of t1u~Uera per month $ 50 UO <br />Average coat of steel per month $25.00 <br />Average coat of oil per month $5.00 <br />Coat of powder 19r-1~2 eta per lb. <br />Average cost per month $200,00 <br />