Laserfiche WebLink
Developmet continued <br />Total member of feet In cross cuts 6000 <br />Cost per foot $7, <br />Total number of feet in winzea and raises 500 <br />Cost per foot $7,. <br />Total number of feet in rievelopment 20~2GC, <br />MEN Ei~iPLOYED: <br />7 machine drill mer, 8 hours ;~ 4,00 <br />6 miners <br />^ <br />. 3.00 <br />3 timbermen " <br /> 3,50 <br />7 trsmmera " <br /> 3.00 <br />4 ore soz•tere ~ <br /> 3.00 <br />3 topmen~ * <br /> 3.00 <br />2 engineers • <br /> 4,00 <br />1 fo z•eman ^ <br /> 5, 00 <br />Average nuabFr~of t~aa enployed for the year 33. <br />COr,Tw: <br />Ave. age oc^*. nF timbers <br />AvPrarc 'n»t o? tlmbers per month ~E75,00- <br />Avarage cost of .steel ner month $35. <br />l:vcf•~:r c ;o;; t o oil per month $10, <br />Cost'of powder 211,30 per cwt, average co»t per month $200. <br />Average as»ay valua of ore per ton $15 <br />. <br />Coat per ton for mining came °y6,G0 <br />Cost rer ton for transporting and treating, ore $5.50 <br />GEtdF3AL SE6fARKS, <br />All shafts, p itv and other expa'rations an property seouraly <br />covered or fN,nced, <br />All aocidents have been reported to the 9ui•esu oi' Mines, <br />Mine parries ltrdetrtilty insuraar!e aP,ainat eocldente in The London <br />GuarauGee Mine is u regulaz• producer and. i» worked continuo~t»1y. <br />Management is fariiliar :vith tits :~tatute» relating to the <br />operation of meta111Perous i:.inea, <br />