Laserfiche WebLink
6ti~3 <br />IInderground tramming, by steel oars end 8~ T-rai1 traok, <br />2,000 ft. of trackage. Drainage natural. Ventilation is <br />good and noaloua gases are not met with. Sanitary , <br />condition is good; shaft le divided into two oompartr <br />manta and is provided with ladderwaya,which are safe , <br />secure and eooeaaible; landings are provided in ladderway <br />not to eaoeed 20 ft. apart; there is no manway oonneoting <br />levels. Pine has more than one Bait for employes, <br />through the Granite and Portland mines and is readilq <br />aocesaible to employees. Lighting underground,by electric <br />lights and candles. <br />S T A T I S T I C S. <br />Average tonnage per month 400. <br />DEVELOP3LENT: <br />Total .number of feet in shafts 1,000 <br />Cost per foot X30. <br />Total number of Peet 1A drifts and levels 3,000 <br />Cost per foot #10. <br />Total number of Peet in urosa outs 1,000 <br />Cost ear foot X10. <br />Total number of feet in winzee and raises 500 <br />Cost per foot #10. <br />Total number of feet in development 4,500, <br />3dEN F:IQPLOYED: <br />3 machine drill men 8 hours 4.00 <br />1 timberman " 4.00 <br />2 trammere " 5.50 <br />2 ore sort era " 3.50 <br />1 tap man ' 5.50 <br />1 engineer " 4.50 <br /> " 5.00 <br />1 foreman <br />Arerag a number of men employed for tha year 16. <br />Cast: <br />Cost of fue1~6.00 per ten <br />Average cost Par iaont h $200. <br />