Laserfiche WebLink
fi ii;d <br />provided with guard rails Mine Methods, by over- <br />kand atopitlg; The Rand-Ingersoll and the Waugh <br />Stoper 3[aohine Drills are employed; timbering by <br />square seta and atulls and lagging; timbers used <br />native spruoe and pine,and the timbering Ss good. <br />Chutes are loaded by gravity-and by hand. Underground <br />tramming by steel oars and AFL Trail traok; t'-'aokags <br />1500 ft. Ventilation natural and sanitary oondition <br />ie good. Shaft is divided into two compartments,and <br />ie provided with ladderways ~9h1oh are safe, seoure <br />and eaaeeeible,and landing are provided not to exeedd <br />20 ft. apart Yine hea two exits for employee, by <br />drift from 3rd level oonneating ^~ith Inoline to eurfa~e <br />200 ft Prom main shaft and ie readily aooosaible for <br />employ ea. Lbghting underground by Dandles. <br />S T A T I S T I C 3. <br />Average tonnage per month no reoord as they mill the <br />ore. <br />DF.VELOpMENT: <br />Total number oP feet in shafts 1250 <br />Cost per toot #25. <br />Total number oP Peet in drifts and levels 8000 <br />Cost per Poot X7.00 <br />Total number of feet in Dross outs 7000 <br />Coat per Foot #7.00 <br />Total number of Peet in winzes and raises 200 <br />Cost per foot X6.00 <br />Total number of feet in development work 16,450. <br />MEN EMPLOYED: <br />2 maokine driil men <br />2 Timbermen <br />8 hours <br />^ <br />$ 4.50 <br />8.50 <br /> <br />