Laserfiche WebLink
6•~J <br />good. Shaft is divided into two oompartments and is provi- <br />dod with ladderways, whioh are safe, secure and accessible, <br />and oontain air line; landings are provided in ladderway <br />not to exoeed 20 ft. apart. There are winzea and ttanways <br />oonneoting levels. Only manway in shaft is kept in repair. <br />There are three exits for employees through the upper and <br />loner tunnels and the Dante shaft, and all are readily <br />acoeseibla to employees. Lighting underground by oandles. <br />S T A T I S T I C S. <br />Gross tonnage 7,000. <br />Average tonnage ner month 60 tone. <br />Total number of feet in shifts 625.• <br />Coat Per foot # 30. <br />Total number of feet in tunnels and edits 2,180 <br />Cost per foot $20. <br />Total number of fai3t In drifts and levels 2,425 <br />Cust par foot $10. <br />Total number of feet icl press-outs 1,000 <br />Cost per foot $10. <br />Total number of feet in glnzas and raises 250 <br />Coat her foot $9. <br /> <br />Total number uP feet in development 6,580 <br />IIEH •FMPLOYF.D: <br />2 lieohine drill roan 8 hours. $4.u0 <br />1 miner s.uo <br />1 tiwberman " 3.50 <br />2 trar~anore " 3.00 <br />z ore sorters • 3.00 <br />1 topman 3.00 <br />1 blaoksmith " 4.00 <br />1 foreman 4.00 <br />average <br />is#s~number of men employed for +.he y~•.ar <br />11 . <br />