My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00149
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 11:06:18 AM
Creation date
11/18/2007 11:55:56 AM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.~ U <br />S T AT I S T I C S. <br />Oroes tonnage not able to ascertain <br />gverage tonnage per month 300 <br />Total number of feet in flhafta 1,200 <br />Coflt per foot $50, <br />Total member of feet in drifts find <br />ievels 30,000 <br />Coat per foot $10,, <br />Tatal number of feet incroflA outs 30,000 <br />Coat per foot $10, <br />Total number of feet in einzes and raises 1,300 <br />Cost par root $10,00 <br />Total number of feet in development <br />• 62.`5 0~ <br />MF1I f'MPLOY~D: <br />7 machine drill men at 8 hours at$ 4.00 <br />2 miners " " 3.00 <br />1 timberman " " 3.50 <br />5 trammerfl " 3.00 <br />3 ore aorterfl " " 3.00 <br />1 top man " 3.50 <br />2 engineers one at $3.50 one at 4,00 <br />1 bleakamith a hours at 4,00 <br />1 superintan<ient flalary•not known <br />1 vatahman " " 2,00 <br />average number of teen empluy.:d .ur the year 23 <br />Coat of foal $5.65 per ton <br />AverapP coat pee' ]ronth ~ 400,00 <br />Coat o P tiiuber 10 ots par foot <br />average coat pa2• nanth 30,00 <br />Cost of steel 9 ate 7:er lb <br />average cost par munth 15,00 <br />Cost of oil fru, 30 to 45 otfl per gal <br />average oost par month 12.00 <br />Coat oP powder 13 eta pez• lb <br />Average coat par month 150,00 <br />Average aflflay value of ore per ton ¢15.00 <br />Caet Per ton mining ore 6,50 <br />Coat Per ton transporting ore front $1,65 to $3.G5 <br />Coat par ton for treatment of ore $3, to 5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.