Laserfiche WebLink
-- Red DLountain Tun.--2 . <br />- -- T I T L E <br />The title ie vest e3 in J. g. Tho~pacn. <br />?rincipal Office located at 153 E_ 12th St., Long Eeach, <br />California. John Dzvey, °upt. °e3 Iaountsin, Colorado. <br />° I S'_T ORY. <br />__ fully describe3 in resort of 1913. <br />T.CP GrA?F~'. <br />-- Fully described in report of 1°l3. <br />r,FOLOGY. • <br />Fu11y described ir. report of 1913. - <br />-ORL S AND 0?F 3 OP IFS. <br />- Fully described in rer•ort of 1913. <br />_QRF 2CF pL=I_T. <br />• Fuller des ~•ibe3 in rencrt cf 1°13. <br />v ;; p L O° T G F S. <br />Fully described in report of 1913. <br />. MTN IIdG ? I1P 1~T_IdE ~ Th OD S. <br />Fully described in re_rcrt cf 1913, except there has been <br />125 feet of shaft sunk at 7g sad 250 feet of drifting done <br />at bottoa of shaft. <br />S T F T T° T T (; C, <br />Only about 100 tons of crude ore shipped this ye;.r. <br />Tctal n•,:.•^.'oer of f=_et in sh-.fta 7125. .Cost per Poo*. X50.00 <br />Tctal nvaber cf feet in Tunnels 15000• Coet per foot n?.5.00 <br />Tot_1 number of feet Sn •?rifta and levels 25250. ,15,00 per foot, <br />Total umber of feet in Rzises 4500• Cost per foot 420.00 <br />Total nvnber cf feet in develonmpnt E1875. <br />Cost of fuel X7.50 Per tcn. <br />----- roPt of ti~ber ;6.00 pPr est. <br />^.oat of noKder .17¢ per lb. <br />Co9t of traneport`ne supplies tc IAine 410.00 per ton. <br />P.verage assay value 4125.00 Per ton. <br />___ Cost per ton Ksning ore ~'S.OO <br />Coat per ton tranaportig cre X5.00 <br />Cost per ton treatwQnt of ore at Smelter $6.00. <br />