My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00148
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 11:51:42 AM
Creation date
11/18/2007 11:55:54 AM
Metadata
Fields
Template:
Mine Books
County
Ouray
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MICKEF BREEA--2. <br /> TITLE. <br />The title is vested in the Mickey Breen Limited not yet in- <br />corporated. ~ The Office ie at the Mine near Ouray, Col o., <br />Manager's name and address is George W. Conner,~0uray, Colorado. <br /> E I S T O A Y. <br />Fully described in report of 1913. <br /> T O P O G R A P A Y. <br />Fully described ir. rel:ort of 1913. <br /> GEOLOGY. <br />Fully described in report of 1913. <br /> O R E S A N D O R E B O D I E 8. <br />Fully described in report of 1912. <br /> S U R F'A C E P LAN T. <br />Fully described in report of 1°13. <br /> E X P L O S I 4 E S. <br />Fully described in report of 1913. <br /> 1d II.II~G AIvD DINE METHODS. <br />Fully described ir. report of 1°13, except there has be en <br />300 feet drifting and 250 feet upraising done. <br /> S T A T I S T I C E. <br />Total number of feet in Tunnels 2700. Coot per foot X20.00 <br />Total <br />" " " <br />number of feet in Drifts 8600• <br />12.00 <br />Total number of feet in crosscuts 1000. "~ " " <br />15.00 <br />Total <br />" "' " <br />numbez of feet in raises 2500. <br />10.00 <br />Cost of fuel per ton average per ~ccnth X15.00 <br /> " " " 50.00 <br />Cost of ticcber <br /> " " " 15.00 <br />Cost of steel <br /> " " 8.00 <br />Cost oY O11 <br />Cost of poxder, 16¢ per pound <br />Cost of tzaneporting supplies " ° 50.00 <br />Average assay value ore per ton 22.00 <br />Cost of mining ore per ton 5.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.