Laserfiche WebLink
BgTBtOR--2. <br />-- <br />TITLE. <br />The title is vested in J. E. Tenneeey, Trustee, Rith Office at <br />42 Broadway St., N. Y.,C. A. Wilfrey, 1~anager, Ouray, Colorado. <br />Leased to C. F.. Wilfrep & Co. <br />-_ _ ~ A I S T O R Y. <br />Filly described in report of 1913. <br />T O P O G R A P H Y. <br />Fully described in report cf 1913. <br />G E O L O G Y. <br />F'ullq described in report of 1913. <br />-___ ORES AND ORF B OTl7ES. <br />Fully described in report of 1513. <br />S U R F A C F. PLAN T. <br />Fully described in report of 1913. <br />F.XPLO° IDE°. <br />?ally 3escrlbed in report of 1?13. <br />M I Il I I1G Ah'D K•IhE L!ETHOD S. <br />Fully described in report of 1913, ercept that a raise is <br />be7ng run to surface fro¢ Igo. 2 Level, a distance of 280 <br />feet to connect RaN made at the surface, and there was <br />400 feet of drifting done in 2do. 2 Level, and 100 feet of <br />upraising. <br /> S T A T I S T I C S. <br /> Total number of feet in shafts 820. Cost per foot $40.00 <br /> Total number of feet in drifts 7100. " " " 10.00 <br /> Total number of feet in crosscuts 210. " " " 15.00 <br /> Total number of feet in raises 730. " 9.00 <br /> Total nun.ber of feet in development 8860. <br /> Average tonnage per month 3000. <br />_ Cost of fuel $9.29 Per ton. <br />- Cost of tuber .6¢ per toot. <br />- Cost of powder $:lh PeT Pound. <br />-- Coet of transporting supplies to Mine $.50 pe r cwt. <br />-- - Average assay value per ton $50 smelting ore $15.00 milling oze. <br />----~ Cost of mining ore $4.00 per ton. <br />- ~- Cost of transporting ore $4.50 per ton. <br />-~ Cost of treatment $6.00 per ton. <br />