Laserfiche WebLink
(2) <br />Hoisting. <br />Same as reports of IgI2-13. <br />Hine• methods. <br />liethod of ore extractiob-stoping and drifting-uaehine drills <br />are employed-Rand-Ingeraoll,aleo single hand drilling. <br />Timbering by square setts and oriba(suffioient).Underground <br />tramming by men,with ordinary mine oara,on I2 lb.to the yard <br />rail.NO water handled-ventilation,naturai draft. <br />Exits. <br />Shaft is divided into two oompertments with ladder way in good <br />oondition-COnneotion is made underground wlth North Moyer shaft <br />and YaK tunnel-Ligtlting underground,eieo*.rioity and candles. <br />statistios.' <br />Average tonnage peT month:-700.-Oroas tonnage per year:-6500. <br />Developiement. <br />Same as reports of 19i2-13. <br /> lien employed. <br />5 l(aohine drilimen. #3.50. Per day. 6 hour shift. <br />13 Miners. #3.00. " 6 " " <br />2 Timberien. 33.50. " 6 " <br />2 Yaohine Help. #3.00. " " 6 " " <br />2 Engineers. #4.00. " " 6 " "• <br />2 Topmen. #3.00. " " 6 " " <br />I Bleokamith. #4.50. " " 6 " N <br />I Cager. #3.50• " " 6 M M <br />Average No.of men employed for the year :-?_6. <br /> Cost. <br />Coat oP timber #22.per I000.-Average oost per month:-!300.00 <br />" " powder,14.I~2 ots per ib." " " " ::-#I25.00. <br />Average. value of ore per ton:-lI2.50. <br />Cost per ton transportation and treatment:-#6.00. <br />General remarks. <br />same ae reports eP 1912-13. <br />