Laserfiche WebLink
~2) <br />in depth end is connected with the Ollie Reod shaft on the I25 <br />foot !eve L <br />Hoisting. <br />Hoisting is done by maohinery driven by atesm,by whioh meri are <br />raised and lowered-~Peight oP load hoisted 1500 lbs.-Diatanne <br />hoisted I25 feet-Cable 7~8 inoh steel,condition,good--Bell line <br />3~ffi inoh manilla rope-3fining Bureau signal code employed,whioh <br />is posted in engine room and at oolier of abaft. <br />tfine methods. <br />over hand atoping employed-27o maohine drills in use-Single hand <br />drilling-Timbering by setts and at'ulle-Underground txamming by <br />.men with buoket and truok,on S ib.to the yard. rail-No water is <br />handled-Ventilation natural draft.NO noxious geaea met with. <br />Exits. <br />Shaft divlded into two compartments with ladder gray in good <br />condition-Connected with Ollie Reed shaft-Lighting underground, <br />candles. <br />Statistlos. <br />Average tonnage per month:-600.-Oroaa tonnage per year:-7.200. <br />Development. <br />total No.of feet in shafts:-150.-Average post per' P.oot:-!20.00. <br />n n" " " laVels:-7100. " n x n :-#8.00 <br />" " " " " upraise:-60. " " " " :-X7.00. <br />" " " " " developement:-I000. <br />1[en employed. <br />15 3(iners. #3.00, per day. R hour shift. <br />2 Engineers. X4.00. " " S » " <br />I Foreman. X5.00. " " 7i " » <br />Average No.of men employed for the year:-I8. <br />Cost. <br />Coat of fuel ;6,OO.per ton-Avexago post Per month:-#60.00, <br />" " timber #25.Der IOOU. " " -~-X75.00. <br />" " powder 14,I~2 ots.per. lb. " » " :-#50.00. <br />Average assay value of ore par ton:-#25.COSt per ton mining ore <br />i2,50,COst per ton traetmeny 50 ots.Cost par ten transportation <br />#I.00.-6enexal remarks-NO Darsons uruler I2 years ampioyad-A11 <br />pits,ahafte oovered-xo strangers ailowad in mind-A7.1 aooidants <br />reported-YO inauranoe parried-y(ine is a regular producer,and is <br />worked oontinuousi¢-Property is not sub-leaned. <br />