My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00129
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2009 8:41:34 AM
Creation date
11/18/2007 11:55:16 AM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
16
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br />(2) <br />Mining. <br />There are' four working shafts on~thia property the Waterloo 600 <br />feet,Porter ahaft,360 feet,Ladder shaft ~1~OO,and No.S shaft 500 <br />feet in depth,theae shafts are all oenneoted on different lev- <br />els,work being carried on in ell four ahafte. <br />Hoisting. <br />same ea reports of,19i2-13. <br />Mine methods. <br />Same ea reports of 1912-13 <br />Exits. <br />Shafts are divided into two oompartmenta with ladder ways in <br />fair oondition,there are numerous exits by eonneotiona between <br />the several shafts on the property also with the Wolf Tone,Maid <br />of Erin,and Caatle View ahafte. <br />Lighting underground-Candles. <br />Statiatios. <br />Average tonnage per month:-1500.-Gress tonnage per year-Ilf.000. <br />Developement:-NO material ohange ainoe reports of 1912-13. <br />Men employed. <br />45 L'inera. #3.00. pox day. N hour shift, <br />9 Trammera. #3.00. 6 " <br />5 Engineers. #4.50. M ~ " n <br /> <br />2 <br />Topmen. <br />#3.25• n n ~ n n <br />I Tlmberman. X3.50. n n ~ n n <br />I Hlaokemith. <br />14.00. <br />~ <br />n <br />n <br />g " <br />" <br />I Laborer. #3.00• " " K n " <br />Average No.of rcen employed for the year:=65• <br />Cost. <br />Coat of fuel #4.50 per ton.Coat of timber l22.per IOOO.COSt of <br />powder 14.I~2 ots.per 1b.The aggregate of coat can not be esti- <br />mated,as lessees do not Keep enY account of same. <br />Average assay value of ore per ton,(entimate) #I2.00. <br />Cost per ton mining ore:-#2.o0.Coat per ton transportation and <br />treatment:-#6.50. <br />General remarks. <br />Same ea reports of 1912-13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.