Laserfiche WebLink
<br />~2) <br />Mining. <br />The main opening to the mine ie the " Emmet,"shaft whioh is <br />650 Peet in depth, at present ail work is confined to the 200 <br />foot level,oonnections is made on this level with the Result <br />and Gonebrod ahaft[+. <br />Hoisting. <br />Same as reports of 1912-13. <br />Nine methods. <br />S*.oping and drifting machine drills are employed-Wood and Sul- <br />livan-Single hand drilling also .employed. <br />Timbering-Setts and criba.Underground tramming.men with mine <br />eara,on I2 ib.to the yard rail-NO water handled-ventilation, <br />natural draft-No noxious gases met with. <br />Exits. <br />Shaft ie divided into two compartments with ladder way in good <br />condition-Connections made with other shafts on working level <br />Lighting underground:-.'leotrioi!y and Dandles. <br />statistics. <br />Average tonnage per month:-250.-Grose tonnage per year:-3000. <br />Developemen*.. <br />same Qa report3 oP 1912-13. <br />Men employed. <br />I Maohlne dri]1man. #3.50. per ,day. 6 hour shift. <br />3 ldiners. #3.00. » 6 » <br />2 Tramaera. 13.00. " » 6 " " <br />I TOpman. #3.00. " " 6 » n <br />I Engineer. #x•00• " " 6 " " <br />I Poreman. #5.00. " » 6 " " <br />Average No.of men emploYad for the year:-y. <br />Coat. <br />Coat of fuel:-#5.5o per ton-Average coat per month:-75.00. <br />» « timber:~22.per I000. " » " » :-#60.00. <br />» " " .-#50.00. <br />" " powd~3r:I4,I~2.ota per lb. <br />Average assay value of ore per ton:-#I0.00. <br />CoAt par to ton transportation and treatment:-~#L.00. <br />Oenerei remarks. <br />same as reports of I912-13. <br />