Laserfiche WebLink
<br />(2) <br />hoisted 3ffi0 Peet-Cable 3~4 inoh steel,good-Heil line I~2 inoh <br />manilla-Yining Bureau code employed,whioh is posted in engine <br />room and Dollar of shaft. <br />Hine methods. <br />Stoping and drifting-No machine drills used-single hand dril- <br />ling-Timbering,aette~and Dribs-Undergroun3 tramming,men with <br />truoK and bucket on I2 ib.to the yard rail-NO water handled. <br />ventilation natural draft-NO noxious gases mot with. <br />Exits. <br />shaft is divides into two oompartmenta,with ladder way in good <br />condition-OOnneotiona made with shafts on other properties. <br />Lighting underground,oandiea. <br />Statietiae. <br />Average tonnage per month:-300.-Orosa tonnage per year: 3600. <br />Development. <br />Total No.oP Peet in shafts:-1F00.-Coat par foot:-$20.00. <br />" " " " " levels:-Iffi00.- " " " ;-$ffi.00. <br />" " " "upraises-15o.- " " " :-$7.00. <br />" " " " " development:-2350. <br />Men employed. <br />~+ Hiners. $3.00. per day. ffi hour shift. <br />I Engineer. $4.00. " " ffi " " <br />Average No.of men employed for the year:-~. <br />Ooat. <br />Cost of fuel:-L+ieotrioity. <br />" " timber$22.per IOOO..Average cost per month:-$70.00. <br />" " powder 14.I~2 atn.per ib." " " " :-$25.00. <br />Average assay value of ors per ton:-$I2.00. <br />cost per ton mining ore:-$2.00. <br />" " " transportation and treatment:-$5.00. <br />General remarks. <br />No persona under the age of I2 years employed-Ali shafte,Pita, <br />and exoavationa filled or covered in-No strangers allowed in <br />mine unless eooompanied by employee-Ail aaoidanta reported to <br />the Hureau of Hines-?line oarrya no indemni*.y insurance against <br />accident-Hine oarrya no insurance for employees-Hine is a reg- <br />ular prbduoer,and is worked .ontinuoualy-Property ie not eub- <br />leased. <br />