Laserfiche WebLink
:,r. ... <br />(2) <br />Hoisting. <br />1(ethod employed,eleotrioity--men are raised and. lowered by maoh- <br />inert'-weight of-load hoisted,2000 1bs.Distanoe hoisted 250 feet <br />cable 3/4 ino~ steel,oondition,good-1(aterial hoisted Prom one <br />level-NO eager employed-Bell rope 3/K ineh manilla-Mining <br />Bureau code employed posted in engine room and collar of ahaft- <br />Mine methods. <br />Stoping and drifting-No machine drills employed-Single hand <br />drilling ueed.Timbering,aetta and oribbing-Underground tram=•~~ <br />ming with men-Ordinary mine oars used on I2 ib.to the yard rail <br />No water handled-Ventilation natural draft-No noxious gases met <br />with. <br />Exits. <br />Shaft is divided into two oompartmente with ladder way in good <br />oondition,oonaaotion made on levels with shafts on adjoining <br />properties-Lighting underground-Osndlea. <br />9tatistios. <br />Average tonnage por month:-250.-Orosa tonnage per year:-3000. <br />Developement. <br />No record kept of developement. <br />Ken employed. <br />~ 3finers. #3.00. per day. g hour. shift. <br />I Engineer. #4.00. " " 6 " " <br />I Foreman. ;5.00. " " E " " <br />Average No'.of men employed for the year:-9. <br />coat .• <br />Coat of fuol:-Electricity. <br />" " timber:-#22.per I000.-Average coat par month:-#I25.00. <br />" " Dowder 14.Z/2.ota per lb. " " " " :-#75•x• <br />Average assay value of ore per ton:-#II.50. <br />coat per ton mining ore:-#2.50. <br />" " " transportation and treatment:-#7.00. <br />General remarks. <br />No persona under I2 years employed-No shafts or pits uncovered <br />No strangers allowed in mine-Ail accidents reported to Bureau <br />of liinea-Pine oarrys indemnity insurance-Fidelity InAUranoe oo. <br />Stine oerrye no insurance for empioyees.~(ine is a regular pradu- <br />and is worked continuousl~Property id not sub-leased. <br />i__..~r <br />