Laserfiche WebLink
c2~- <br />Hbiating, <br />Method employed,maohinery driven by aCeam,by whioh men are low- <br />ered and raised-weight of load holated,1500 1be.Dietanoe hoisted <br />300 Peet-Gable 3~4 inoh stesl,oondition good Beii line 3~a maw. <br />ills rope-8lning,Buresu oods used,whioh ie posted in engine room <br />and ooilar of shaft. <br />Mine methods. <br />Method of are extraotion-Stoping an3 driftin~NO maohine drills <br />employed-Single hand drilling used-Timbering,setts,and oribs. <br />Underground trammi,ng,buoket and trunk on Z2.lb.to the yard rail. <br />No water handled-Ventilation natural draft.No noxious gases met <br />with. <br />Exits. <br />Shaft is divided into two oomPartraents,with ladder way in good <br />oondition-NO oonneotions with eh'afts on other properties, <br />Lighting undergrourid,oandles. <br />Statistios:-Tonnage per month:-75,Agarage tonnage per year:-q00. <br />Total No.of Peet in shafts:-300.-Goat per foot:-X25.00, <br />" " " " " levels:-500-. " " " :-17.00. <br />" " " unraiae:-15o. " " " :-ta,oo. <br />" " " " " development:-950. <br />Yen employed. <br />6 Miners. #3.00, per day, t! hour shift. <br />I Engineer. #4,00. " " g " " <br />Average No.of men employed for the year:-7. <br />poet. <br />Cost oP Puel:-#5.50.per ton-Average oost per month:-!50.00. <br />" " timber #22,per I000.- " " " " :-130.00. <br />" " powder 14.I~2 ota,per lb." " " " :-325.00. <br />Average assay value of ors per ton:-!16.00. <br />cost per ton mining ore:-t2.50.0ost per ton transportation and <br />treatment:-#g.o0. <br />General remarks. <br />No persons under I2 years employed in mino-All pits,and shafts <br />P11ed or oovered in-NO persons allowed in mine unleaa~ aooompanie <br />Mine oarrys no indamity insuranoo-0arrys no insuranoe for amplo- <br />Yeea-All aooidants xxported to the Bureau of Mines-Pine is a <br />regul~t produaarand worked ^.ontinuously-Proeprty not sub-leased, <br />