My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00129
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2009 8:41:34 AM
Creation date
11/18/2007 11:55:16 AM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
16
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'._'N:.i. 1. ~..... <br />l2' <br />Mining. <br />There are two shaftB sunk on this property,Resurreetion shaft <br />No.I.being II00 feet in depth, and Resurreotion shaft No.2 a50 <br />feat;deep,shaft Ho.i.is oonneoted with the Yak tunnei~from <br />Whioh ail work is being done, shaft No.2.ia oonneoted with No. <br />I.the maohinnery on both shafts is out of oommiasion. <br />Mine methods. <br />The method of ore extraotion ie by atoping and drifting. <br />Maohine drills are employed-Waugh,ingeraoll,and Leyner. <br />Single and double hand drilling also employed-Timbering by <br />atulls,setts,and Dribs. <br />Underground tramming by eleotrin lonomotivee,with Truax aide <br />dumping care on 20 ib.to the yard rail. <br />No water handled-Ventilation,natural draft-NO noxious gases <br />met with. <br />Exits. <br />Shafts are divided into two oompartments with ladder ways in <br />Rood oondition,entranoe to and from workings by way of Yak <br />tunnel-Lighting +uidergrounri,elentrioity and Handles. <br />StatlatiHa. <br />Average tonnago per month:-I00.-Oroas tonnage par year:-I2o0. <br />Developement. <br />Same ae report of 1913. <br />Men employed. <br />5 Miners. #3.00. per.day. g hour shift. <br />Cost. <br />Coat of fuel:--Eleotrioity. <br />" " timber:-#17.50.Der IOOO.Average Host per month:-#I00. <br />" " powder 14.I~2 Hts.Per ib. " " " " :-#25. <br />Average assay value oP ore per.ton:-r1I.76. <br />Cost per ton mining ore:-;I.96. <br />" " " transportation anti treatment:-#6.00. <br />General remarks. <br />same as report of 1913• <br />
The URL can be used to link to this page
Your browser does not support the video tag.