Laserfiche WebLink
~..,. <br />(2) <br />640 feet, and oonnectione made with the Result shaft on adjoining <br />property. <br />Hoisting. <br />Same ea report of I91$. <br />1(ine methods. <br />Stoping and driftin~Maohine drills are employed-Jaok Hammers. <br />Single hand drilling also in use-Timbering-Stulls and oriba. <br />Tnderground tramming by men ~Aith ordinary mine oars on I2 lb.to <br />the yard rail-NO water dealt with-ventilation,natural 3raft.No <br />gases met with. <br />Exits. <br />Shaft is divided into two oompartments with ladder way in good <br />condition-OOnneotions made with other shafts. <br />Lighting underground-Eleotrioity and candles. <br />Statiatioa, <br />Average tonnage per month:-s50.-Oroea tonnage per year:-I0.000. <br />Developement. <br />Total No.of feet in shafts-G40.-Cost per Poot:-!25.00. <br />" " " " levels-r5oo. " " " :-;7.00. <br />" " " " " upraises-I00.-" " " :-16,00. <br />" " " " in developement:-2.050. <br />}ten employed. <br />4 k(aohine men. ;3.50. per day. s hour shift. <br />16 uiners. ;3.00. " " s " " <br />4 Trammers, ;3.00. " " s " " <br />2 Topmen. ;3.00. " " 6 " " <br />2 Engineers. ;4.00. " " s " " <br />I Foreman. ';5.00. " " s " " <br />Average No.of men employed for the year:-29. <br />Cost. <br />Cost of fuel:-Lleotrloity. <br />" " timber:-l22,per IOOO.Average coat pair month:-lI25,00. <br />" " powder. 14.I~2 ote.per ib." " " " :-!75.00. <br />Average assay value of ore per ton:-!15.00. <br />Cost per ton mining ore:-!2.50. <br />" " " transportation and treatment:-;s,00. <br />General romarks. <br />same ae report of 1913• <br /> <br />=_ <br />